Setting a schedule to receive a building permit
- Solution:
Building an outline for immediate action while setting long term goals
years' experience in managing statutory & licensing procedures
Netivey Hakama is developing a managerial – professional tool box that bridge the gap between the planning institutions and the entrepreneurial community. We create professional content and work to turn managing statutory & licensing procedures into a profession that requires an adequate education and training.
RFQ
Receiving Initial Data
Completing Statutory & Permitting Data
A Meeting With the Client
Preparing a Quote
Submitting a Quote
We Start Working
A Zoning Plan determines the designations, uses, construction rights and other limitations regarding the construction in a specific area. Zoning plans differ in hierarchy from national to regional, detailed and urban plan. A zoning plan is considered to be a legal document in every way.
A Building Permit determines the architectural planning and uses of the property in accordance with the instructions of the Zoning Plan.
A building can be occupied only after the local authority issues a No. 4 Form and/or a Certificate of Completion.
It is possible to object to a Zoning Plan within the 60 day deposit period. The objection should be based on planning considerations and not proprietary. It is possible to submit a proprietary claim based of article 197 to the building and construction law.
In case that the construction or the use didn’t start the Building Permit is valid for one year. Once construction has started it is valid for three.
The shortest way to approve changes that were made during construction is A Municipal Engineer Approved Permit. During construction, on occasion, it is required to build not I accordance with the Building Permit. According to the Planning and Construction law, the municipal engineer may approve certain changes in an expedient procedure that doesn’t require a hearing and/or approval of the local committee. This procedure doesn’t require submitting a request for information and a permit is issued once a plan is submitted, checked and approved.
The local committee issues No. 4 Forms and Certificates of Completions as a way to approve that the building matches the Building Permit its conditions and appendix. It is also a way for the committee to verify that the construction is up to code and that the building is ready to be populated.
It is possible to start construction only after getting a Building Permit and a Permission to Start Construction. Getting the committee’s decision to approve a request, paying construction fees or completing the terms for getting a Building Permit do not allow you to start construction.
A Zoning Plan is the least certain of all statutory and licensing procedures since it is open to the objection of anyone who finds the plan damaging.
Layouts of NOPs and other plans are available online at various databases such as: the Planning Administration, Israel Land Authority, the relevant Local Committee, Govmap, etc.
A zooming plan can be initiated by a land owner (private or institutional), and/or local a municipality or a governmental institute etc.
Any one who changes the planing or the use of a proper must do so after getting a Building Permit.
It is possible to deviate from the instruction of a Zoning Plan as long as it is no considered a major deviation. You can ask for a relief from the instructions of the Zoning plan, as part of the request for a Building Permit, and pending the approval of the local committee, it is possible to build in contradiction to the instructions of the Zoning Plan.
A notification according to articles 77 and 78 is published as part of the making of a Zoning Plan in order to specify the limitations under-which Building Permits can be issued within the area that is included in it. It is possible to apply for an exclusion from the notification by coordinating with the relevant planning institute.
Amendment no. 101 to the Planning and Construction law defines a few construction works as exempted from a Building Permit, as long as they are in accordance with the guidelines of the local committee. Works such as building a pergola, a storage for a residential home, accessibility works etc.
Before buying a property it is highly recommended to go over the relevant Zoning Plans and Building Permits in order to understand the Curren and future building rights, to know what else is bing built near by and to make sure that the property was built according to the Building Permit that was issued by the Local Committee.
נתיבי הקמה מתמחה בניהול הליכי סטטוטוריקה ורישוי בנייה. החברה מלווה את החברות המובילות במשק בכל הקשור לניהול וקידום הליכי הרישוי מתב”ע, טופס 4 ותעודת גמר, ועד לרישיון עסק. הצוות מורכב ממתכננים המתמחים בניהול פרויקטים בתחום המספקים מענה מיידי מקצועי ואיכותי וכן מתווה להליכים הנדרשים להשלמת הפרויקט.